HB 705An Act amending Title 66 (Public Utilities) of the Pennsylvania Consolidated Statutes, in restructuring of electric utility industry, providing for development of grid infrastructure.

Congress · introduced 2025-02-24

Latest action: Referred to ENERGY, Feb. 24, 2025

Sponsors

Action timeline

  1. · house Referred to ENERGY, Feb. 24, 2025

Text versions

No text versions on file yet — same ingest as the action timeline populates these. Each version has direct links to the XML / HTML / PDF at govinfo.gov.

Bill text

Printer's No. 0724 · 10,082 characters · source document

Read the full text
PRINTER'S NO.   724

                     THE GENERAL ASSEMBLY OF PENNSYLVANIA



                         HOUSE BILL
                         No. 705
                                               Session of
                                                 2025

     INTRODUCED BY WEBSTER, HOHENSTEIN, PIELLI, HILL-EVANS, SANCHEZ,
        KHAN, CERRATO AND CIRESI, FEBRUARY 24, 2025

     REFERRED TO COMMITTEE ON ENERGY, FEBRUARY 24, 2025


                                    AN ACT
 1   Amending Title 66 (Public Utilities) of the Pennsylvania
 2      Consolidated Statutes, in restructuring of electric utility
 3      industry, providing for development of grid infrastructure.
 4      The General Assembly of the Commonwealth of Pennsylvania
 5   hereby enacts as follows:
 6      Section 1.    Title 66 of the Pennsylvania Consolidated
 7   Statutes is amended by adding a section to read:
 8   § 2816.   Development of grid infrastructure.
 9      (a)    Coordination.--The commission shall ensure adequate
10   coordination among electric distribution companies to prepare
11   this Commonwealth for the grid capacity and resilience needed to
12   ensure the reliable and secure operation of the grid in response
13   to increased demand from quickly growing industries.
14      (b)    Guidelines.--No later than 180 days after the effective
15   date of this section, the commission shall issue guidelines for
16   electric distribution companies to prepare infrastructure
17   development plans to promote grid security and improve the
18   resilience and reliability of the grid while addressing growing
 1   demand. The plan shall address all of the following:
 2            (1)   The establishment of a secure, resilient grid
 3      network capable of withstanding cyber and physical threats,
 4      as well as any capacity expansion or other modification
 5      required to maintain reliability and meet demand from new and
 6      growing sectors, including transportation electrification.
 7            (2)   The electrification of critical public
 8      infrastructure, including public transit, emergency services
 9      and governmental fleets, to enhance the resilience and
10      recovery capabilities of this Commonwealth, specific
11      inclusion of long-term projects and plans for increases in
12      demand from emerging industries, including increased electric
13      vehicles designed for light, medium and heavy duty, data
14      centers and other large load customers.
15            (3)   Deployment of grid modernization technologies,
16      including energy storage systems, microgrids, electric
17      vehicle charging stations and advanced metering
18      infrastructure to improve grid security and resilience.
19            (4)   Requirements to ensure that electric distribution
20      company development plans are implemented in a competitive
21      and nondiscriminatory manner with opportunities for third-
22      party security vendors and technology providers.
23            (5)   Open standard communication protocols for grid
24      operations and system interoperability to enhance security
25      against cyber threats.
26            (6)   Policies to ensure grid infrastructure is deployed
27      in underserved and high-risk areas vulnerable to grid
28      disruptions.
29      (c)   Grid infrastructure development plans.--
30            (1)   An electric distribution company shall, consistent

20250HB0705PN0724                    - 2 -
 1    with the guidelines issued under subsection (b), file an
 2    application for approval of a grid infrastructure development
 3    plan with the commission within one year of the effective
 4    date of this section.
 5        (2)   The plan shall:
 6              (i)    Describe the electric distribution company's
 7        proposal to ensure the resilience, security and
 8        reliability of the grid while meeting Federal and State
 9        energy security standards.
10              (ii)    Include strategies to optimize grid
11        performance, including demand management, distributed
12        generation integration, deployment of infrastructure to
13        support transportation electrification and advanced
14        cybersecurity measures.
15              (iii)    Include an evaluation of the impact that
16        implementation of the plan will have on the following:
17                     (A)   Increased grid security and reliability,
18              particularly in areas where critical infrastructure
19              is located.
20                     (B)   The expansion and strengthening of the
21              transmission and distribution network to withstand
22              physical and cyber threats.
23                     (C)   The expansion and strengthening of the
24              transmission and distribution network to meet
25              electricity demand from new and growing sources,
26              including an evaluation of public electric vehicle
27              charging infrastructure and vehicle adoption rates.
28                     (D)   Economic activity and economic development
29              within the public utility's service territory,
30              including capital investments, the direct or indirect

20250HB0705PN0724                     - 3 -
 1                  creation of jobs and additions to the tax base of
 2                  this Commonwealth.
 3                         (E)   The rates charged to the bundled retail
 4                  customers of the public utility.
 5                         (F)   The financial risk to customers of the
 6                  public utility, including impacts on low-income
 7                  ratepayers.
 8            (3)   The electric distribution company shall develop the
 9      plan in consultation with all of the following:
10                  (i)    The Department of Transportation.
11                  (ii)    The Department of Environmental Protection.
12                  (iii)    The Pennsylvania Emergency Management Agency.
13                  (iv)    Local and regional governments and
14            representatives of underserved communities within the
15            electric distribution company's service territory.
16                  (v)    Experts in grid security and resilience.
17                  (vi)    Any other pertinent group or entity determined
18            by the electric distribution company or the commission.
19      (d)   Approval criteria.--When considering an application for
20   approval under subsection (c), the commission shall consider all
21   of the following:
22            (1)   Whether the investments, programs and expenditures
23      are reasonably expected to improve the public utility's
24      system efficiency, security and operational flexibility.
25            (2)   Whether the investments, programs and expenditures
26      increase the resilience and security of critical
27      infrastructure.
28            (3)   Whether the investments, programs and expenditures
29      position the electric distribution company to meet and enable
30      increasing electricity demand from transportation

20250HB0705PN0724                         - 4 -
 1      electrification and other growing sectors.
 2            (4)   Whether the costs of the investments, programs and
 3      expenditures are reasonably mitigated through the utilization
 4      of available Federal and State security incentives and
 5      funding programs, including direct and indirect grants.
 6            (5)   Whether the investments, programs and expenditures
 7      support private capital investments and skilled jobs in
 8      related security services.
 9            (6)   Whether the investments, programs and expenditures
10      are transparent and incorporate public reporting
11      requirements.
12      (e)   Plan approval or disapproval.--
13            (1)   The commission shall, after reasonable notice and
14      hearing and within 180 days of submission of an application
15      under subsection (c), approve or disapprove the grid
16      infrastructure development plan.
17            (2)   If the commission does not approve the plan, the
18      commission shall describe in detail the reasons for the
19      disapproval, and the electric distribution company may file,
20      within 60 days, a revised plan to address the deficiencies.
21            (3)   The commission shall approve or disapprove the
22      revised plan within 60 days of receipt.
23      (f)   Additional plans.--An electric distribution company
24   shall file an updated grid infrastructure development plan five
25   years after the initial approval of the plan.
26      (g)   Recovery of costs.--A public utility that engages in
27   measures to enhance grid security infrastructure in accordance
28   with a plan approved under subsection (e) may recover the public
29   utility's reasonable costs through a commission-approved tariff
30   rider or base rate.

20250HB0705PN0724                    - 5 -
 1      (h)   Definitions.--As used in this section, the following
 2   words and phrases shall have the meanings given to them in this
 3   subsection unless the context clearly indicates otherwise:
 4      "Grid security."     The protection of the electrical grid from
 5   physical, cyber and operational threats to ensure continuous
 6   reliable service.
 7      "Transportation electrification."     The use of electricity to
 8   power vehicles.
 9      "Underserved community."     A community that meets any of the
10   following criteria:
11            (1)   Qualified census tracts with high poverty rates or
12      public health concerns.
13            (2)   Public school zones with a high percentage of
14      students eligible for free or reduced-price meals.
15            (3)   Areas vulnerable to significant grid disruptions or
16      security threats.
17      Section 2.     This act shall take effect in 90 days.




20250HB0705PN0724                    - 6 -

Connected on the graph

Outbound (1)

datetypetoamountrolesource
referred_to_committeePennsylvania House Energy Committeepa-leg

The full graph

Every typed relationship touching this entity — 1 edge across 1 category. Grouped by what the connection is; the heaviest few are shown, with a link to the full list.

Committees

Referred to committee 1 edge

Who matters

Members ranked by combined influence on this bill: role (sponsor 5 / cosponsor 1), capped speech count from the Congressional Record, and recorded-vote engagement.

#MemberRoleSpeechesVotedScore
1Joe Webster (D, state_lower PA-150)sponsor05
2Benjamin V. Sanchez (D, state_lower PA-153)cosponsor01
3Carol Hill-Evans (D, state_lower PA-95)cosponsor01
4Chris Pielli (D, state_lower PA-156)cosponsor01
5Christopher M. Rabb (D, state_lower PA-200)cosponsor01
6Dan K. Williams (D, state_lower PA-74)cosponsor01
7Joe Ciresi (D, state_lower PA-146)cosponsor01
8Joseph C. Hohenstein (D, state_lower PA-177)cosponsor01
9Kyle J. Mullins (D, state_lower PA-112)cosponsor01
10Melissa Cerrato (D, state_lower PA-151)cosponsor01
11Tarik Khan (D, state_lower PA-194)cosponsor01

Predicted vote

Aggregated from: actual roll-call votes (when present) → sponsor → cosponsor → party median (predicts YES when ≥25% of the caucus sponsored/cosponsored). Each row labels its confidence tier so you can see why a position was predicted.

0 predicted yes (0%) · 543 predicted no (100%) · 0 unknown (0%)

By party: · R: 0 yes / 277 no · D: 0 yes / 263 no · I: 0 yes / 3 no

Activity

Every typed-graph event involving this entity, newest first. Each row is one edge in the influence graph; click the date to jump to its provenance.

  1. 2026-05-20 · was referred to Pennsylvania House Energy Committee · pa-leg

pac.dog is a free, independent, non-partisan research tool. Every candidate, committee, bill, vote, member, and nonprofit on this site is mirrored from primary U.S. government sources (FEC, congress.gov, govinfo.gov, IRS) and each state's Secretary of State / election commission — no third-party data vendors, no paywall, no editorial intermediation. Citations to the originating source are on every detail page.